2017/07/07 14:51

Financial Result

The feasibility study has been prepared based on present Project Cost and available technical data in cooperation with a foreign expert Engineering Company that have experience in working with Iranian Companies, in order to clarify the scope of work and prepare the necessary document for applying the most new comprehensive financing package between the Government of the Islamic republic of Iran and the Chinese Authority. As far as MISBP is concerned, the total package at the moment is about 3.6 billion dollar whereas the 85% will be paid by the Financer and up to the 5% of needed equity will be provided by Foreign Direct Investment (FDI) method by the EPC contractor, in compliance with the FIPPA Law and finally the remaining 10% of equity will be settled by MISBP. The Government of the Islamic Republic of Iran and also the management of MIS are currently fully engaged together, on this new financing package.

 

Gas based Petro-Refinery and Its Downstream Industries

Scope Of  Product Chain

  • Petrochemical refinery Plant

  • C2 to PE Plant

  • C3 to PP Plant

  • C4 to MTBE Plant

Power

150 MW

Location

Zilaee, Masjed Soleyman, Khuzestan, Iran

EPCF Contractor

Wuhuan Engineering Co.

Access to National Grid

Yes

Licensing, legal and governmental permissions

  • Establishment Permission

  • Feed Stock Contract

  • License for Water Intake

  • Environmental License(In Progress)

  • Land Ownership Documents (~230 Hectare)

Water

30

MMM3/Y

Total land dedicated

230

Hectare

Project Execution Period

60

Month

Construction Period

54

Month

Commissioning Period

6

Month

Total Capital Expenditure

3.6 (±20)

Billion $

Finance Structure

10 %(Equity)

5%(FDI)

85 %(Loan)

Loan Interest

~6

%

Grace Period

6

Month

Loan Pay Back Period

~5

Years

Internal Rate of Return on Capital

23.9

%

Internal Rate of Return on Equity

55.9

%

 